HYPER HD-GD1000-EU laptop dock/port replicator Docking USB 3.2 Gen 1 (3.1 Gen 1) Type-C Silver

HYPER HD-GD1000-EU laptop dock/port replicator Docking USB 3.2 Gen 1 (3.1 Gen 1) Type-C Silver

was €313.88  €284.87 inc VAT
€231.60 exc VAT
Estimated Delivery: No ETA
This product is currently unavailable, however, this might only be temporary. Contact us for more info, tel: 021 4966850
SKU: HD-GD1000-EU

Share:  
Ports & interfaces
Connectivity technologyDocking
Host interfaceUSB 3.2 Gen 1 (3.1 Gen 1) Type-C
USB 3.2 Gen 1 (3.1 Gen 1) Type-A ports quantity5
USB 3.2 Gen 1 (3.1 Gen 1) Type-C ports quantity2
USB Power Delivery (USB PD)Yes
USB Power Delivery up to65 W
HDMI ports quantity2
DisplayPorts quantity2
DisplayPort version1.4
Microphone inNo
Combo headphone/mic portYes
Headphone connectivity3.5 mm
Network
Ethernet LANYes
Ethernet LAN (RJ-45) ports1
Performance
Card reader integratedNo
Data transfer rate10 Gbit/s
HD type4K Ultra HD
Number of displays supported4
Maximum refresh rate60 Hz
Product colourSilver
On/off switchYes
Power
Power source typeDC
Power consumption (max)135 W
Software
Other operating systems supportedChromeOS
Weight & dimensions
Width210 mm
Depth80 mm
Height28 mm
Weight270 g
Packaging data
Quantity per pack1 pc(s)
Technical details
Warranty period2 year(s)

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €3.95.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.