Cisco C1101-4P Integrated Services Router with 4-Gigabit Ethernet (GbE) Ports, GE Ethernet WAN Router, Integrated USB 3+, 1-Year Limited Hardware Warranty (C1101-4P)

Cisco C1101-4P Integrated Services Router with 4-Gigabit Ethernet (GbE) Ports, GE Ethernet WAN Router, Integrated USB 3+, 1-Year Limited Hardware Warranty (C1101-4P)

was €1,385.96  €1,280.43 inc VAT
€1,041.00 exc VAT
Estimated Delivery: 4-5 days
SKU: C1101-4P

Share:  
WAN connection
Ethernet WANY
DSL WANN
SIM card slotN
3G/4G USB modem compatibilityY
Network
Ethernet LANY
Ethernet LAN interface typeGigabit Ethernet
Ethernet LAN data rates1000
Cabling technology10/100/1000Base-T(X)
DSL features
ADSLY
ADSL2Y
VDSL2Y
Ports & interfaces
Ethernet LAN (RJ-45) ports4
USB portY
Management features
Quality of Service (QoS) supportY
Security
Security algorithmsAES,WPA2
Access Control List (ACL)Y
Design
Product colourGrey
Indication lightY
Product typeTabletop router
Features
Internal memory4000
Power
Power source typeAC
AC input voltage100 - 240
AC input frequency50 - 60
Output voltage12
Power consumption (typical)30
Operational conditions
Operating temperature (T-T)0 - 40
Storage temperature (T-T)0 - 65
Operating relative humidity (H-H)10 - 85
Storage relative humidity (H-H)5 - 95
Operating altitude0 - 3000
Non-operating altitude0 - 4570
Packaging data
Package width254
Package depth333.502
Package height177.8
Package weight3083.9
Logistics data
Quantity per pack1
Harmonized System (HS) code85176990
Country of originChina

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €3.95.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.