Zebra 220Xi4 label printer 300 x 300 DPI Wired

Zebra 220Xi4 label printer 300 x 300 DPI Wired

was €13,176.13  €9,016.28 inc VAT
€7,330.31 exc VAT
Estimated Delivery: 4-5 days
SKU: 223-80E-00003

Share:  
Printing
ColourN
Maximum resolution300 x 300
Paper handling
Ribbon length300
Maximum roll diameter81.3
Media thickness0.076 - 0.305
Media thickness (imperial)0.003 - 0.012
Supported paper width216
Supported paper width (imperial)8.5
Maximum media length991
Maximum media length (imperial)39/150
Core diameter25.4
Ports & interfaces
Connectivity technologyWired
Parallel ports quantity1
RS-232 ports1
USB 1.1 ports quantity1
Standard interfacesEthernet
Performance
Page description languagesXML,ZPL II
Internal memory16
Flash memory8
Built-in barcodesCode 39,Code 49,Code 93,MaxiCode,PDF417,Postnet,QR Code,UPC-A,UPC-E
Certification-BSMI, -cTUVus, -CCC, -CE, -C-Tick, -EN55022 Class B, -EN55024, -EN61000-3-2,3, -FCC Class B, -GOST-R, -ICES-003 Class B, -IEC 60950-1 / EN60950, -KCC, -NOM, -S Mark, -STB, -UkrSEPRO, -VCCI, -ZIK.
Power
Power requirements90 - 264 VAC, 48 - 62 Hz
Operational conditions
Operating relative humidity (H-H)20 - 85
Storage relative humidity (H-H)5 - 85
Operating temperature (T-T)5 - 40
Storage temperature (T-T)-40 - 60
Storage temperature (T-T)-40 - 140
Weight & dimensions
Weight32700
Logistics data
Harmonized System (HS) code84433210
Other features
Dimensions (WxDxH)401.6 x 517.5 x 393.7
Weight (imperial)72

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.