StarTech.com Brocade BRSFP-1GECOPR Compatible SFP Module - 1000BASE-T - SFP to RJ45 Cat6/Cat5e - 1GE Gigabit Ethernet SFP - RJ-45 100m

StarTech.com Brocade BRSFP-1GECOPR Compatible SFP Module - 1000BASE-T - SFP to RJ45 Cat6/Cat5e - 1GE Gigabit Ethernet SFP - RJ-45 100m

€25.69 inc VAT
€20.89 exc VAT
Estimated Delivery: No ETA
This product is currently unavailable, however, this might only be temporary. Contact us for more info, tel: 021 4966850
SKU: BRSFP-1GECOPR-ST

Share:  
Performance
SFP transceiver typeCopper
Maximum data transfer rate1250
Interface typeSFP
Maximum transfer distance100
Ethernet LANY
Ethernet interface typeFast Ethernet,Gigabit Ethernet
Networking standardsIEEE 802.3
Duplex systemFull
Digital Diagnostics Monitoring (DDM)N
Features
Product colourSilver
Hot-swapY
Mean time between failures (MTBF)510469759
Brand compatibilityBrocade
Compatible productsBRSFP-1GECOPR
Certificates
Compliance certificatesRoHS
CertificationCE, FCC, UR, REACH
Weight & dimensions
Width68
Depth13.7
Height13.8
Weight15
Packaging content
Quantity per pack1
Packaging data
Package width90
Package depth115
Package height31
Package weight50
Logistics data
Master (outer) case width90
Master (outer) case length115
Harmonized System (HS) code85369010
Master (outer) case height31
Products per master (outer) case1

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.