APC Easy Rack PDU, Metered Outlet, 0U, 3 Phase, 22kW, 230V, 32A, (18) C13 and (6) C19 outlets, IEC60309 3P+N+PE inlet

APC Easy Rack PDU, Metered Outlet, 0U, 3 Phase, 22kW, 230V, 32A, (18) C13 and (6) C19 outlets, IEC60309 3P+N+PE inlet

was €2,539.46  €2,352.34 inc VAT
€1,912.47 exc VAT
Estimated Delivery: 8-9 days
SKU: EPDU2232MBO

Share:  
Design
PDU typesMetered
TypeThree-phase
Rack capacity0U
MountingVertical
Housing materialAluminium
Product colourBlack
DisplayLCD
On/off switchN
Ports & interfaces
AC outlets quantity32
Power plugC13 coupler
AC outlet typesC13 coupler,C19 coupler
Features
Daisy chainN
Reset buttonY
LED indicatorsY
Cable length3
Management features
MonitoringCurrent,Power,Voltage
Power
Nominal input voltage400
AC input frequency50/60
Maximum current32
Nominal output voltage230
Output voltage230
Load capacity22000
Number of phases3
Maximum power22000
Certificates
Compliance certificatesCE,RCM,REACH,RoHS,cTUVus,UKCA
CertificationCE, TUV, EN 62368-1, RCM, UKCA
Operational conditions
Operating temperature (T-T)-5 - 50
Storage temperature (T-T)-25 - 65
Operating relative humidity (H-H)5 - 95
Storage relative humidity (H-H)5 - 95
Operating altitude0 - 3000
Non-operating altitude0 - 15000
Weight & dimensions
Width55
Depth56
Height1800
Weight8380
Packaging data
Package weight9550
Package width195
Package depth130
Package height2030

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.