ASUS TUF-GAMING-650B power supply unit 650 W 20+4 pin ATX ATX Black

ASUS TUF-GAMING-650B power supply unit 650 W 20+4 pin ATX ATX Black

€103.56 inc VAT
€84.20 exc VAT
Estimated Delivery: 3-4 days
SKU: 90YE00D1-B0NA00

Share:  
Power
Total power650
AC input voltage100 - 240
Input current25
Combined power (+3.3V)130
Combined power (+12V)612
Combined power (+5V)130
Combined power (-12V)9.6
Combined power (+5Vsb)15
Max output current (+3.3V)25
Max output current (+12V)51
Max output current (+5V)25
Max output current (-12V)0.8
Max output current (+5Vsb)3
Ports & interfaces
Motherboard power connector20+4 pin ATX
Motherboard power cable length600
Number of SATA power connectors5
SATA power cable length400
Peripheral (Molex) power connectors (4-pin)4
PCI Express power connectors (6+2 pin)4
PCI Express power cable length600
CPU power connector (4+4 pin)Y
CPU power cable length800
Cabling typeNon-Modular
Performance
80 PLUS certification80 PLUS Bronze
PurposePC
Power supply unit (PSU) form factorATX
Design
Product colourBlack
Cooling typeActive
Fan diameter135
Number of fans1
On/off switchY
Packaging content
Cables includedCPU,PCIe,Peripheral (Molex),SATA
Certificates
Compliance certificatesRoHS
Weight & dimensions
Width150
Depth150
Height86
Weight2060
Packaging data
Package weight2750
Package typeBox
Logistics data
Harmonized System (HS) code84733020

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.