D-Link 1-port Mini-GBIC SFP to 1000BaseLX, 10km for all

D-Link 1-port Mini-GBIC SFP to 1000BaseLX, 10km for all

€54.62 inc VAT
€44.41 exc VAT
Estimated Delivery: 4-5 days
SKU: DEM-310GT

Share:  
Performance
SFP transceiver typeFiber optic
Maximum data transfer rate1250
Interface typeSFP
Single-mode fiber (SMF) supportedY
Multi-mode fiber (MMF) supportedN
Fiber optic connectorLC
SFP transceiver standardLX
Maximum transfer distance10000
Wavelength1310
Ethernet interface typeGigabit Ethernet
Networking standardsIEEE 802.3z
Cabling technology1000Base-LX
Duplex systemFull
Features
Product colourMetallic
Hot-Plug supportY
Hot-swapY
Power
Maximum voltage3.3
Certificates
CertificationMSA, RoHS
Operational conditions
Operating temperature (T-T)0 - 70
Storage temperature (T-T)-40 - 85
Packaging data
Package width74
Package depth131
Package height49
Package weight64
Other features
Dimensions (WxDxH)29.8 x 11.8 x 56.3
I/O portsmini-GBIC
Logistics data
Shipping (inner) case length360
Shipping (inner) case width260
Shipping (inner) case height310
Shipping (inner) case net weight3200
Products per shipping (inner) case50
Pallet gross weight (air)246800
Master (outer) cases per pallet (air)54
Products per pallet (air)2700
Pallet gross length1020
Pallet gross width1220
Pallet height (air)1990
Pallet gross weight (sea)246800
Master (outer) cases per pallet (sea)54
Products per pallet (sea)2700
Pallet height (sea)1990
Shipping (inner) case gross weight4200
Harmonized System (HS) code85177900

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.

You May Also Like