C4911A | Original HP 82 Cyan Ink, 69ml

C4911A | Original HP 82 Cyan Ink, 69ml

€67.13 inc VAT
€54.57 exc VAT
Estimated Delivery: No ETA
This product is currently unavailable, however, this might only be temporary. Contact us for more info, tel: 021 4966850
SKU: C4911A

Share:  
Performance
CompatibilityHP DesignJet 800, 800PS, Copier CC800PS, 815 MFP, 820 MFP, 500, 500 Plus, 500PS, 510
Print technologyThermal Inkjet
Printing coloursCyan
OEM codeC4911A
HP segmentBusiness
Country of originSingapore,Malaysia
Weight & dimensions
Width125
Depth39
Height143
Weight119
Packaging data
Package width125
Package depth39
Package height143
Package weight150
Operational conditions
Operating temperature (T-T)5 - 40
Operating relative humidity (H-H)10 - 80
Storage temperature (T-T)-40 - 60
Storage relative humidity (H-H)10 - 80
Logistics data
Master (outer) cases per pallet90
Pallet dimensions (W x D x H)1016 x 1219 x 2306
Products per pallet3600
Layers per pallet10
Pallet size (EU)1892 x 1016 x 1219
Pallet gross weight623000
Products per master (outer) case40
Master (outer) case gross weight6700
Quantity per pack1
Harmonized System (HS) code84439990
Technical details
Box contentsInk cartridge
Total carbon footprint (kg of CO2e)
Master (outer) cases per pallet layer9
Other features
UNSPSC-code44103105

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.

You May Also Like