Lindy 10 Port USB 3.0 Hub with On/Off Switches USB 3.2 Gen 1 (3.1 Gen 1) Type-B 5000 Mbit/s Black

Lindy 10 Port USB 3.0 Hub with On/Off Switches USB 3.2 Gen 1 (3.1 Gen 1) Type-B 5000 Mbit/s Black

€100.67 inc VAT
€81.84 exc VAT
Estimated Delivery: 3-4 days
SKU: 43370

Share:  
Ports & interfaces
Host interfaceUSB 3.2 Gen 1 (3.1 Gen 1) Type-B
Hub interfacesUSB 3.2 Gen 1 (3.1 Gen 1) Type-A
USB 3.2 Gen 1 (3.1 Gen 1) Type-A ports quantity10
Ports quantity11
DC-in jackY
Features
Data transfer rate5000
Product colourBlack
Housing materialAcrylonitrile Butadiene Styrene (ABS),Aluminium
USB Power Delivery (USB PD)N
Cable length1
CertificationCE, FCC, RoHS & REACH, CP65
Power
Power supply typeAC
Input voltage12
Input current3
Weight & dimensions
Width169.6
Depth46.2
Height25
Weight42
Packaging data
Quantity per pack1
Package width205
Package depth132
Package height52
Package weight600
Package typeCarton
Packaging content
AC adapter includedY
Included power plug typesAU,EU,UK,US
Cables includedUSB Type-A to USB Type-B
ManualY
Operational conditions
Operating temperature (T-T)-5 - 56
Operating temperature (T-T)23 - 133
Storage temperature (T-T)-20 - 60
Operating relative humidity (H-H)5 - 95
Technical details
Compliance certificatesCE,Federal Communications Commission (FCC),REACH,RoHS
Other features
ChipsetRTS5411

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.