NETGEAR M4250-26G4XF-PoE+ Managed L2/L3 Gigabit Ethernet (10/100/1000) Power over Ethernet (PoE) 1U Black

NETGEAR M4250-26G4XF-PoE+ Managed L2/L3 Gigabit Ethernet (10/100/1000) Power over Ethernet (PoE) 1U Black

€4,077.51 inc VAT
€3,315.05 exc VAT
Estimated Delivery: 4-5 days
SKU: GSM4230PX-100EUS

Share:  
Management features
Switch typeManaged
Switch layerL2/L3
Ports & interfaces
Basic switching RJ-45 Ethernet ports quantity24
Basic switching RJ-45 Ethernet ports typeGigabit Ethernet (10/100/1000)
SFP+ module slots quantity4
USB 2.0 ports quantity1
Network
IPv4 routes512
IPv6 routes128
VLAN supportY
Number of VLANs4
Data transmission
Switching capacity132
Throughput98.21
MAC address table16000
Latency (1 Gbps)2.29
Latency (10 Gbps)0.83
Jumbo frames supportY
Jumbo frames12000
Packet buffer memory16
Protocols
IPv4 FIB entries256
IPv6 FIB entries16
Design
Rack mountingY
Form factor1U
Product colourBlack
Temperature sensorY
Performance
Built-in processorY
Processor modelARM Cortex-A57
Noise level42
FanlessY
Power
Power supply includedY
Power over Ethernet (PoE)
Power over Ethernet (PoE)Y
Power over Ethernet plus (PoE+) ports quantity24
Power over Ethernet (PoE) power per port45
Weight & dimensions
Width440
Depth43.2
Height400
Weight5450
Packaging content
Cables includedAC,LAN (RJ-45),USB Type-C
Rack mount kitY
Logistics data
Harmonized System (HS) code85176990

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.