APC NetShelter Switched Rack PDU, 1U, 1PH, 2.3kW 230V 10A or 2.5kW 208V 12A, 8 C13 outlets, C14 cord

APC NetShelter Switched Rack PDU, 1U, 1PH, 2.3kW 230V 10A or 2.5kW 208V 12A, 8 C13 outlets, C14 cord

was €1,259.57  €1,144.23 inc VAT
€930.27 exc VAT
Estimated Delivery: 3-4 days
SKU: AP7920B

Share:  
Design
PDU typesMetered,Switched
Rack capacity0U/1U
MountingHorizontal/Vertical
Product colourBlack
Ports & interfaces
AC outlets quantity8
Power plugC14 coupler
AC outlet typesC13 coupler
Input connection typeIEC-320 C14
Features
Cable length1.98
Management features
MonitoringCurrent,Power,Voltage
Outlet controlLock-out,Recycle,Turn off,Turn on
Power
Nominal input voltage200-230
AC input frequency50 - 60
Maximum current10
Nominal output voltage208-230
Load capacity2300
Maximum input current per phase10
Maximum total current draw per phase10
Maximum power2300
Certificates
Compliance certificatesRoHS
CertificationcUL Listed, CE, CSA, EN 55022 Class A, EN 55024, EN 61000-3-2, EN 61000-3-3, GOST, IRAM, MIC, UL 60950, UL Listed, VDE, VCCI, REACH
Operational conditions
Operating temperature (T-T)0 - 45
Storage temperature (T-T)-25 - 65
Operating relative humidity (H-H)0 - 95
Storage relative humidity (H-H)0 - 95
Operating altitude0 - 3000
Non-operating altitude1 - 15000
Weight & dimensions
Width445
Depth108
Height44
Weight2270
Packaging content
Packaging content
Packaging data
Package weight3450
Package width470
Package depth343
Package height70
Logistics data
Total carbon footprint (kg of CO2e)915.89

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.

You May Also Like