StarTech.com 2m CAT6a Ethernet Cable - 10 Gigabit Shielded Snagless RJ45 100W PoE Patch Cord - 10GbE STP Network Cable w/Strain Relief - Blue Fluke Tested/Wiring is UL Certified/TIA

StarTech.com 2m CAT6a Ethernet Cable - 10 Gigabit Shielded Snagless RJ45 100W PoE Patch Cord - 10GbE STP Network Cable w/Strain Relief - Blue Fluke Tested/Wiring is UL Certified/TIA

€12.88 inc VAT
€10.47 exc VAT
Estimated Delivery: 4-5 days
SKU: 6ASPAT2MBL

Share:  
Features
Product colourBlue
Cable length2
Cable standardCat6a
Cable shieldingU/FTP (STP)
Connector 1RJ-45
Connector 2RJ-45
Connector 1 genderMale connector
Connector 2 genderMale connector
Connector contacts platingGold
Jacket materialPolyvinyl chloride (PVC)
Conductor typeStranded
Conductor materialCopper
Cable ratingCMG (CM)
Cabling technology10GBase-T
Ethernet interface type10 Gigabit Ethernet
AWG wire size26
Data transfer rate10000
Frequency500
Power over Ethernet (PoE)Y
Snagless cable bootY
Plug and PlayY
Certificates
Compliance certificatesRoHS
CertificationCE, REACH
Weight & dimensions
Weight88
Packaging content
Quantity per pack1
Packaging data
Package width200
Package depth220
Package height15
Package weight98
Logistics data
Harmonized System (HS) code84733080
Master (outer) case width360
Master (outer) case length400
Master (outer) case height255
Products per master (outer) case100

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.