StarTech.com HPE 813874-B21 Compatible SFP+ Module - 10GBASE-T - SFP to RJ45 Cat6/Cat5e - 10GE Gigabit Ethernet SFP+ - RJ-45 30m - HPE BladeSystem, c-Class

StarTech.com HPE 813874-B21 Compatible SFP+ Module - 10GBASE-T - SFP to RJ45 Cat6/Cat5e - 10GE Gigabit Ethernet SFP+ - RJ-45 30m - HPE BladeSystem, c-Class

€278.29 inc VAT
€226.25 exc VAT
Estimated Delivery: 3-4 days
SKU: 813874B21ST

Share:  
Performance
SFP transceiver typeCopper
Maximum data transfer rate10000
Interface typeSFP+
Maximum transfer distance30
Networking standardsIEEE 802.3an
Ethernet LAN (RJ-45) ports1
Auto MDI/MDI-XY
Digital Diagnostics Monitoring (DDM)N
Features
Product colourSilver
Housing materialZinc steel
Hot-swapY
Mean time between failures (MTBF)4598430
Brand compatibilityHP
Power
Power consumption (typical)2.3
Certificates
Compliance certificatesRoHS
CertificationCE, FCC
Operational conditions
Operating temperature (T-T)0 - 70
Storage temperature (T-T)-40 - 90
Operating relative humidity (H-H)0 - 95
Weight & dimensions
Width13.4
Depth69.8
Height13.8
Weight58
Packaging content
Quantity per pack1
Packaging data
Package width75
Package depth120
Package height33
Package weight31
Logistics data
Master (outer) case width340
Master (outer) case length638
Harmonized System (HS) code85369010
Master (outer) case height290
Products per master (outer) case150
Country of originChina

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.