StarTech.com 75ft CAT6 Ethernet Cable - Orange CAT 6 Gigabit Ethernet Wire -650MHz 100W PoE RJ45 UTP Network/Patch Cord Snagless w/Strain Relief Fluke Tested/Wiring is UL Certified/TIA

StarTech.com 75ft CAT6 Ethernet Cable - Orange CAT 6 Gigabit Ethernet Wire -650MHz 100W PoE RJ45 UTP Network/Patch Cord Snagless w/Strain Relief Fluke Tested/Wiring is UL Certified/TIA

€26.72 inc VAT
€21.72 exc VAT
Estimated Delivery: 4-5 days
SKU: N6PATCH75OR

Share:  
Features
Product colourOrange
Cable length22.9
Cable standardCat6
Cable shieldingU/UTP (UTP)
Connector 1RJ-45
Connector 2RJ-45
Connector 1 genderMale connector
Connector 2 genderMale connector
Connector contacts platingGold
Jacket materialPolyvinyl chloride (PVC)
Conductor typeStranded
Conductor materialCopper
Cable ratingCMG (CM)
Cabling technology10/100/1000Base-T(X)
Ethernet interface typeGigabit Ethernet
AWG wire size24
Data transfer rate1000
Frequency650
Power over Ethernet (PoE)Y
Snagless cable bootY
Plug and PlayY
Certificates
Compliance certificatesCE,RoHS
Weight & dimensions
Weight899
Packaging data
Package width255
Package depth330
Package height25
Package weight916
Logistics data
Harmonized System (HS) code84733080
Master (outer) case width376
Master (outer) case length410
Master (outer) case height276
Products per master (outer) case15

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.