StarTech.com 7-Port USB 2.0 Hub - Metal Industrial USB-A Hub with ESD Protection & 350W Surge Protection - Din Rail, Wall or Desk Mountable - TAA Compliant USB Expander Hub

StarTech.com 7-Port USB 2.0 Hub - Metal Industrial USB-A Hub with ESD Protection & 350W Surge Protection - Din Rail, Wall or Desk Mountable - TAA Compliant USB Expander Hub

€133.16 inc VAT
€108.26 exc VAT
Estimated Delivery: 3-4 days
SKU: ST7200USBM

Share:  
Ports & interfaces
Host interfaceUSB 2.0 Type-B
Hub interfacesUSB 2.0
USB 2.0 ports quantity7
Ports quantity7
Terminal block portY
Features
Data transfer rate480
Product colourBlack
Housing materialSteel
Surge protectionY
LED indicatorsY
Hot-swapY
Plug and PlayY
CertificationCE, FCC, RoHS, REACH, TAA
Power
Input voltage7 - 24
Weight & dimensions
Width61.5
Depth133
Height36.3
Weight283
Packaging data
Package width216
Package depth151
Package height51
Package weight500
Packaging content
Cables includedUSB
ManualY
DIN rail kit includedY
Operational conditions
Operating temperature (T-T)0 - 55
Storage temperature (T-T)-20 - 85
Operating relative humidity (H-H)5 - 95
Performance
Mean time between failures (MTBF)170227
Logistics data
Master (outer) case width436
Master (outer) case length514
Master (outer) case height264
Products per master (outer) case25
Harmonized System (HS) code84719000
Other features
ChipsetTerminus - FE2.1

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.

You May Also Like