StarTech.com 15cm (6in) USB-C Charging Cable, 60W (3A) PD, Dual-Layer Braided Nylon/TPE Jacket, Rugged USB C Charging Cord, USB 2.0 Laptop Charger Cable

StarTech.com 15cm (6in) USB-C Charging Cable, 60W (3A) PD, Dual-Layer Braided Nylon/TPE Jacket, Rugged USB C Charging Cord, USB 2.0 Laptop Charger Cable

was €14.05  €9.59 inc VAT
€7.80 exc VAT
Estimated Delivery: 4-5 days
SKU: USB2CC15CMNCBR

Share:  
Features
USB versionUSB 2.0
Connector 1USB C
Connector 2USB C
Connector 1 genderMale connector
Connector 2 genderMale connector
Connector 1 form factorStraight
Connector 2 form factorStraight
AWG wire size23/28
Connector contacts platingNickel
Cable jacket materialNylon,Thermoplastic elastomer (TPE)
Maximum data transfer rate0.48
Cable typeRound cable
Plug and PlayY
USB Power Delivery (USB PD)Y
USB Power Delivery revision2.0
USB Power Delivery up to60
Product colourBlack
Power
Output current (max)3
Weight & dimensions
Cable length0.15
Cable diameter4
Weight9
Packaging data
Package width100
Package depth100
Package height15
Package weight25
Packaging content
Quantity per pack1
Operational conditions
Operating temperature (T-T)-20 - 40
Storage temperature (T-T)-20 - 70
Certificates
Compliance certificatesCE,RoHS
Logistics data
Products per master (outer) case225
Master (outer) case width410
Master (outer) case length310
Master (outer) case height320

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.