Mercusys 5-Port Gigabit Desktop Switch with 4-Port PoE+

Mercusys 5-Port Gigabit Desktop Switch with 4-Port PoE+

was €31.54  €28.74 inc VAT
€23.37 exc VAT
Estimated Delivery: 3-4 days
SKU: MS105GP

Share:  
Ports & interfaces
Basic switching RJ-45 Ethernet ports quantity5
Basic switching RJ-45 Ethernet ports typeGigabit Ethernet (10/100/1000)
Network
Networking standardsIEEE 802.3af,IEEE 802.3at,IEEE 802.3x
10G supportN
Full duplexY
Half duplexY
Flow control supportY
Auto MDI/MDI-XY
Auto-negotiationY
Optical fiber
Transmission distance (max)0.1
Data transmission
Switching capacity10
MAC address table2000
Jumbo frames supportY
Jumbo frames9
Design
Rack mountingN
StackableN
Product colourBlack
Housing materialMetal
LED indicatorsY
Wall mountableY
Power
Power sourceDC
Power supply includedY
AC input voltage220
AC input frequency50
Power consumption (typical)3.13
Power consumption (max)75.15
Power over Ethernet (PoE)
Power over Ethernet (PoE)Y
Power over Ethernet (PoE) ports quantity4
Total Power over Ethernet (PoE) budget65
Operational conditions
Operating temperature (T-T)0 - 40
Storage temperature (T-T)-40 - 70
Operating relative humidity (H-H)10 - 90
Storage relative humidity (H-H)5 - 95
Weight & dimensions
Width99.8
Depth98
Height25
Packaging content
Cables includedAC
Quick start guideY
Certificates
CertificationCE, RoHS

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €5.99.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.