HP Color LaserJet B5L36A 220V Fuser Kit

HP Color LaserJet B5L36A 220V Fuser Kit

€248.78 inc VAT
€202.26 exc VAT
Estimated Delivery: 7-8 days
SKU: B5L36A

Share:  



Ensure consistent colour and optimum print quality every time with the easy to install HP Color LaserJet fuser kit.
  • Printer fuser kit
  • 150000 pages
  • Brand compatibility: HP

Features
Product typePrinter fuser kit
Page yield150000 pages
Country of originChina
Brand compatibilityHP
CompatibilityHP LaserJet E55040, E57540, M553, M577 HP LaserJet Enterprise Flow M578 HP LaserJet Enterprise M552, M553, M554, M555, M577, M578 HP LaserJet Flow E57540, M577
HP segmentBusiness, Enterprise
Operational conditions
Operating temperature (T-T)15 - 27 °C
Storage temperature (T-T)0 - 35 °C
Storage relative humidity (H-H)10 - 90%
Weight & dimensions
Width380 mm
Depth148 mm
Height85 mm
Weight1.44 kg
Packaging data
Package weight2.3 kg
Package width500 mm
Package length20 cm
Package depth200 mm
Package height288 mm
Logistics data
Master (outer) cases per pallet12 pc(s)
Products per pallet96 pc(s)
Layers per pallet8 pc(s)
Master (outer) cases per pallet layer12 pc(s)
Harmonized System (HS) code84439990
Pallet gross width120 cm
Pallet gross length100 cm
Pallet gross height2.33 m
Pallet gross weight230.8 g
Other features
Pallet dimensions (W x D x H)1200 x 1000 x 2334 mm

Frequently asked questions

For more information, visit our FAQ section.

We deliver from Ireland to Ireland and delivery is €3.95.

We use An Post express label service for the majority of our deliveries.

  • Estimated delivery of 1-2 days, this product is in-stock and will ship same day for orders placed before 3 pm.
  • Estimated delivery of 2-3 days, this product is supplied to us locally which generally adds one extra day.
  • Estimated delivery of 3-4 days, this product will usually take 2 days to arrive into stock.
  • Estimated delivery of 4-5 days, this product is supplied to us from the UK, which usually adds two or three extra days.
  • Estimated delivery of 7-8 days, this product is supplied to us from the mainland Europe, which adds a minimum of four extra days.

You May Also Like